ARCHIVE NOTICE: This website is a preserved copy of the old Cement Council of Texas website, as it appeared between 2004 and 2008, kept for preservation only. It is not the current website of the Cement Council of Texas and is not to be confused with the active website at cementx.org.

Cedar Hill - Liberty Car Wash

Designed to look like the Independence Hall in Philadelphia, PA, this 5,000 sq.-ft. full service facility has 14' tall Amvic walls with structural steel welded to plate imbed to support its roof.

ICF Builders installed 6,000 sq.-ft. of wall in just seven days. Even more impressive was that 100 yards of concrete was placed in the walls in 2 hours and 45 minutes using a 32-meter boom pump. A representative of Central Concrete Pumping said, “This is the smoothest ICF pour I’ve ever seen.” A representative of Hunt Electric said, “We have never done an ICF job before and did not know what to expect. a Vista representative showed us a few tricks and we have found it easier and faster than CMU.”

The owners said they were amazed at the speed and could not be happier about the results.